NOTE:  A SEPARATE CONNECTION, LINE AND METER IS REQUIRED FOR ECH HOUSE, BUILDING OR MOBILE HOME.


Annual standby fire protection charges for private fire protection will be charged as follows:


6" or Smaller                                     $300.00

8"                                                     $400.00

Private Fire Protection customers outside the district will be billed at the above rate plus 50%.

5/8-5/4" meter -     $500.00 tap fee + impact fee  (see chart)


1" meter -               $600.00 tap fee + impact fee  (see chart)


1 1/2" meter -         $600.00 tap fee + materials & labor + impact fee (see chart)


2" meter -               $600.00 tap fee + materials & labor + impact fee (see chart)


3" & larger meter - $600.00 tap fee + meter, flanges, & backflow device + impact fee (see chart).  Owner is responsible for tapping, construction, pre-cast box, lid, and all piping on 3" taps and larger.


Property owner is responsible for line from the water meter to structure.

ALL METER CONNECTIONS OUTSIDE THE DISTRICT WILL BE CHARGED $100.00 OVER THE ABOVE TAP FEES.



COST OF METER INSTALLATIONS

METER SIZE
ERU
WATER
SEWER
COMBINED
5/8"-3/4"
1
$80.00
$180.00
$560.00
1"
2.5
$950.00
$450.00
$1,400.00
1 1/2"
5
$1,900.00
$900.00
$2,800.00
2"
8
$3,040.00
$1,440.00
$4,480
3"
15
$5,700.00
$2,700.00
$8,400.00
4"
25
$9,500.00
$4,500.00
$14,000
6"
50
$19,000.00
$9,000.00
$28,000.00
8"
80
$30,400.00
$14,400.00
$44,800
10"
125
$47,500.00
$22,500.00
$70,000.00

.

CHART FOR IMPACT FEES PER EQUIVALENT RESIDENTISL UNIT & METER SIZE